Loading Events

« All Events

  • This event has passed.

Dewberry/ JCPS Controls Replacement – Package 5

December 19, 2023

Package 5:

 

 2023.11.22_JCPS Controls Replacement – Package 5 – Bid Documents

 

Project Scope of work is listed below:

Replacement of existing BAS Controls systems and Heating Hot Water and Chilled Water pumps, and Minisplit Unit Replacements at Riverwood Elementary School, River Dell Elementary School, West Smithfield Elementary School, and Glendale Kenly Elementary School.

Note:

PreBid Meeting                Tuesday, November 28th @ 9:30am at Riverwood Elementary School with walk through afterward.

 

Bid Opening                       Tuesday, December 19, 2023 @ 4:00pm, 2320 US 70 Business, Smithfield, NC 27577

Please see Addendum #1 document for your use on the JCPS Controls Replacements Package 5 project in the link below.

 JCPS Controls Upgrades Pkg 5 – Addendum #1

It was brought to my attention that there were some issues with the link I sent before and the revised drawings not being available. I believe I fixed the problem. Please use the link below if you had any trouble accessing the files.

 JCPS Controls Upgrades Pkg 5 – Addendum #1

2023.12.14 JCPS Controls Replacements – Package 5 – Addendum No 2

 

Details

Date:
December 19, 2023
Event Category: