Request for Quote
For Construction Subcontractors Services and Materials |
AIRPORT GRADING AND STOCKPILE PROJECT – Charlotte Douglas International Airport
CLIENT: CHARLOTTE DOUGLAS INTERNATIONAL AIRPORT – No AF023-022
ENGINEER: RS&H and WSP
Project location In vicinity of 5740-B West Blvd – Charlotte, NC 28208
Please reply above with your intent
DEADLINE: Respond with offer by February 1, 2023 11:00 AM or ASAP
Proposals are encouraged to be on company letterhead, with pricing noting scope inclusions or exclusions, bonding rate, DMWBE utilization, qualifications may be considered with your offer. Send offer to [email protected]; fax 919-241-1659
Thalle Construction Company Inc.900 NC HWY 86 North Hillsborough 27278 phone 919.241.1490 fax 919.241.1659: Estimating-Dept [email protected] : Vincent Zannini 919.241.1635 Craig Miller 919.241.1627
Subcontractors, Services and Materials Sought
– General: Surveying, Materials Lab Testing, Temporary Facilities, Traffic Control & Flagging
– Site Prep: Erosion & Sediment Control, Tree Clearing and Grubbing, Sediment Basins,
– Demolision: Pavement demo, Concrete crushing-recycling, Storm and Utilities demo
– Stone and Soil: Dump truck Hauling, stone aggregates, Riprap, Soils
– Site Work: Earthworks, fabrics , Grass Seeding
– Storm Drainage RCP pipe , Precast structure, inlets headwall and wingwalls
– Storm Structures: Box Culverts triple 12×12, Duel 10×10 endwalls and wingwalls
– Utilities: DIP pipe and fittings, sewer manholes, Trenchless 48” steel Casing
– Pavement, Milling, 8” Portland cement paving, Striping and marking
– Fencing: chain link SIDA fence Removal & relocation, chan-link fence, vehicle gates
– Electrical: Concrete encased Duct Bank, Octagonal manholes, communication manhole
Scope of work:
This project is part of the 4th Parallel Runway Program and involves early grading and stockpiling activities. The scope of work primarily involves excavation, hauling, and placement of approximately 2,000,000 cubic yards of material from the future runway footprint into three designated stockpiles on Airport property. Specific construction activities include grading, drainage, fencing, erosion & sediment control, tree clearing, temporary traffic control, sanitary sewer installation, double/triple box culvert extension, and duct bank installation.
Contract Time
– INTERMEDIATE COMPLETION TIME #1: COMPLETION OF WORK AREAS 1 AND 2 – 580 days From NTP
– INTERMEDIATE COMPLETION TIME #2: COMPLETION OF ENERGY INFRASTRUCTURE WORK – 160 Days from NTP
– INTERMEDIATE COMPLETION TIME #3: COMPLETION OF WORK AREA 3 – 125 Days from NTP
Subcontractor Insurance Requirements, Safety And Site Security Obligations for Work within Airport Operations Area (AOA) Security Identification Display Area (SIDA) shall comply with Airport Security Requirements including insurance General and Vehicle Ins $5 Million coverage, security badging, operators/drivers Training program, equipment requrements, and other cContract requirements;
BID DOCUMENTS Project bid item schedule, Special Provisions-Specifications, Plan Drawings, & other documents are available at no cost from hyper-link https://securecc.smartinsight.co/#/PublicBidProject/684375 Or by advance request at Thalle Construction offices
CONTRACT COMPLIANCE All contracts and purchase orders will comply with and flow-down project documents requirements, contract clauses, not limited to: qualification; State & Federal laws and regulations Insurance Coverage, Employment Practices, wage obligation, taxes, Civil Rights Acts, Equal Employment, Business Utilization MBE/WBE/DBE firms are encouraged to participate & must be certified by NCDOT to be listed at time of bid, Work & materials may be combined or divided to facilitate maximum participation. Subcontractors are obliged to sublet to 2nd & 3rd tier DBE subcontractors. Firms needing assistance with obtaining bonding, loan capital, lines of credit, insurance, obtaining equipment & supplies materials or negotiate joint venture & partnership arrangements, or to inquiry Thalle’s Insurance requirements, payment terms, pre approval for agreements or quickpay, may contact Thalle Nan Sumner 919.241.1636 [email protected] for assistance. Thalle will negotiate fairly with interested DBE firms & will not reject firms as unqualified without sound reasons-based on capabilities.
|