Rock Hill, SC/ Wildcat Creek Force Main Relocation – Conveyance

Rock Hill, SC/ Wildcat Creek Force Main Relocation - Conveyance The work consists of furnishing all materials and equipment and performing all labor necessary to construct the Wildcat Creek Force Main Relocation/Conveyance as detailed on the drawings and in the specifications. In general, the work includes installing approximately 2,200 linear feet of 36-inch ductile iron…

Wilimgton, NC/ ENGINEERING SERVICES FOR DRINKING WATER EXTENSIONS TO UNSERVED COMMUNITIES FOR THE CAPE FEAR PUBLIC UTILITY AUTHORITY

Wilimgton, NC/ ENGINEERING SERVICES FOR DRINKING WATER EXTENSIONS TO UNSERVED COMMUNITIES FOR THE CAPE FEAR PUBLIC UTILITY AUTHORITY As part of the 2023 Appropriations Act, Session Law (S.L. 2023-134), the State Budget allocates $18,000,000 to CFPUA for drinking water extensions to unserved communities in New Hanover County impacted by PFAS. This funding, which will be…

Charleston, SC/ Restroom Renovations at James Island Charter HS

Charleston, SC/ Restroom Renovations at James Island Charter HS This Scope of Work includes, but is not limited to, restroom renovations that involve upgrading and modernizing the existing restroom facilities. The scope of work includes the like-replacement of toilet partitions, sinks, toilets, and urinals, as well as painting and the installation of new tile on…

State of North Carolina/ Bituminous Plant Mix Asphalt

Please be advised the following solicitation, IFB 54-LC-12113948 for Shaft Couplings has been posted to eVP. All bids due by March 21, 2024, at 2:00 PM ET. https://evp.nc.gov/solicitations/details/?id=fc633415-d3df-ee11-904d-001dd8306860 Nicole Gye’Nyame Program Analyst II Purchasing Unit North Carolina Department of Transportation 919 707 2635    office 919 708 3792    mobile 919 733 8743    fax ndgyenyame@ncdot.gov #54-SBG-08012024 -…

Liberty, NC/ Toyota Project — Team Member Mall 603

Subcontractor Outreach and Pre-Bid Meeting Toyota Project — Team Member Mall 603 Friday, March 22, 2024 — 1:00pm to 3:00pm The Nussbaum Center for Entrepreneurship 1451 S Elm Eugene Street, Greensboro, NC 27406 PROJECT DESCRIPTION LeChase is hosting an subcontractor outreach and pre-bid meeting for all construction industry-related firms (majority and minority) that have an…

City of Raleigh/ Saratoga Drive Culvert Endwall Replacement Project

Moffat Pipe, Inc. will be bidding on The Saratoga Drive Culvert Endwall Replacement Project for The City of Raleigh. We encourage minority and women business enterprise contractors to participate in the process. Moffat Pipe, Inc. will consider the following options/actions if requested in the proposal: assistance in obtaining bonding or insurance; coordinate joint payment agreements; assist…

Women’s Business Center of The Triad/ Do The Work (DTW) Power Luncheon

The Conference Center at Guilford Tech Community College 7908 Leabourne Road, Colfax, NC, United States

The Women’s Business Center of The Triad (formerly Women’s Business Center of Greensboro) is back this year with a one day event, DTW (Do The Work) Power Luncheon, being held on Tuesday, March 26, 2024, at The Conference Center at Guilford Technical College (GTCC). We invite you to join us for what is sure to be yet another impactful and…

Balfour Beatty/Brownstone/ CMs Northwest School of the Arts Project 2

Balfour Beatty/Brownstone/ CMs Northwest School of the Arts Project 2 2nd & 3rd Tier Subcontractor Outreach Meeting: Friday, March 1, 2024 11:00 am – 12:00 pm https://teams.microsoft.com/l/meetupjoin/19%3ameeting_MzgzMWM3MzYtMjgzYi00MTdkLWIzM2MtYWI1NzI4YzE4NG M4%40thread.v2/0?context=%7b%22Tid%22%3a%2201f3a409-b48f-4f2c-b95b7ea1977a06ed%22%2c%22Oid%22%3a%2200b87c0d-8cd6-4be2-93f7- a9ad72f055b5%22%7d Project Info: The CMS Northwest School of the Arts Project 2 consists of a new visual arts and classroom building, renovating five existing buildings on campus,…

Union County, NC/ Helmsville Road Force Main Improvements (2024-066)

Union County, NC/ Helmsville Road Force Main Improvements (2024-066) The Project consists of providing, fusing, and testing approximately 2,611 linear feet of 8-inch high density polyethylene (HDPE) sewer force main on the ground surface, connecting to a 2,000 linear foot segment of existing and active 8-inch HDPE force main lying on the ground, connecting to…