Plans, specifications and advertisement for the McLeod Hall HVAC Replacement at Fayetteville State University.
Sealed proposals will be received until 1:30pm on December 28, 2022, in the Fayetteville-Cumberland Regional Entrepreneur and Business HUB, 1073 Murchison Road, Fayetteville, NC 28301 for the construction of the McLeod Hall, HVAC Replacement project at Fayetteville State University at which time and place bids will be opened and read. The project scope of work includes conversion of 2-pipe system to 4-pipe CHW/HW systems, addition of chilled water piping, replacement of 2-pipe fan coil units and AHUs with 4-pipe units, replacement of exhaust fans, replacement of CHW/HW pumps, lower first floor corridor ceiling, and replace first floor corridor lighting. Additional work to be included as alternates includes chiller replacement, chiller relocation, and HW pipe insulation replacement.
Bids will be received for single prime bid contracts. Plans and specifications are available to Prime Bidders by contacting McKim & Creed via e-mail to Allison Jurgens at [email protected] beginning on November 22, 2022. Bid documents will also be available with iSqFt, CMD Group, Construct Connect, Dodge Data and Analytics, NC Institute of Minority Economic Development, and Hispanic Contractors Association of the Carolinas.
The State reserves the unqualified right to reject any and all proposals.
2022-11-22 – FSU McLeod Hall HVAC Replacement Specs
2022-11-22 – FSU McLeod Hall HVAC Replacement Drawings