Greenville, NC – Public Works Stormwater Pipe Improvements Phase 2 (20220983.00.RA)

The Public Works Stormwater Pipe Improvements Phase 2 project includes rerouting, replacing, and upsizing the existing storm drainage system from approximately 1,300 feet upstream of Beatty Street to the existing upstream headwall on Skinner Street with an 8’X8’ RCBC within the general area of the City of Greenville Public Works Yard. Traffic control and erosion control are also included within the scope of this project.